






















|
|
Gateway NMRA Rail Op 2011 Layout
Randy Meyer
Canyon & Rocky Mountain Railroad
|
A 54’x26’ Sn3 John Armstrong custom designed layout
using coved background corners and ceiling set in the
high mountains of Colorado. The scenery extends from
near the floor to the ceiling, with extensive scenic
backdrop paintings by Greg Gray. The backdrop and
scenery are designed to highlight the extensive
collection of highly detailed PBL narrow gauge (Soundtraxx
equipped) engines. The line climbs from a 52" dual gauge
yard at Salida to a 67" switchback mining area in the
Red Mountains. Two branchlines provide additional lumber
and mining traffic for the mainline narrow gauge D&RGW.
Control is with Digitrax DCC. The scenery is about 30%
complete.
|
Superintendent
|
Randy Meyer
|
|
Division or Location
|
D&RGW, Central to Southwestern Colorado
|
|
Session Schedule
|
Friday 5/20/2011 @ 6:30pm
Saturday 5/21/2011 @ 2:00pm
|
|
Scenery
|
Mountains with lots of rock castings
50-60%
|
|
Structures
|
Kits, scratchbuilt and foam core mock ups
|
|
Layout Size
|
26' by 54'
|
|
Scale
|
S scale, Standard & Sn3
|
|
Era
|
Late 1930s
|
|
Control System
|
Digitrax
|
|
Radios
|
Yes
|
|
Fast Clock
|
4 to 1
|
|
Train Control
|
Track Warrants
|
|
Length of Session
|
3 hours
|
|
Number of Crew
|
7 minimum to 14 maximum
|
|
Listed Jobs
|
Two Yardmasters, Dispatcher, Road crews 1
or 2 man depending on number of people
|
|




|

|
|
|
Send email to webmaster@gatewaynmra.org
with questions or comments about this web site
Copyright ©
2012 Gateway Division NMRA, Privacy Policy, Legal Notice, Search, Visitors
This page last updated
February 26, 2011 |
|